Moose Valley RR Co.
Operations Headquarters: M. Leon Agne Engine Facility, 7021 Surrey Drive, Berkeley Spgs W.Va. (304) Ro4-1424
Bulletin #19981
January 1, 1970
TO: All train crews
ON: Road service over B&O trackage
DIVISION: Delta
SUBDIVISION: (B&O) Mainline
SLEEPY CREEK C&S CHANGES
THE INTERLOCKING AT SLEEPY CREEK (MP 117.1) IS NOW FULLY SIGNALED IN NORMAL DIRECTION OF TRAVEL.
OPERATION OF TRAINS THROUGH THIS INTERLOCKING MUST COMPLY WITH RULE 201D WHICH STATES:
"OPERATION OF TRAINS THROUGH AUTOMATIC BLOCK SIGNAL TERRITORY TRAINS WILL BE GOVERNED BY AUTOMATIC SIGNALS IN THE FOLLOWING MANER; SIGNALS DISPLAYING CLEAR ASPECT TRAINS MAY PASS AT TRACK SPEED. SIGNALS DISPLAYING STOP ASPECT TRAINS MUST STOP AND NOT PASS SIGNAL OR FOUL INTERLOCKING PLANT, AND WILL NOTIFY DISPATCHER WHEN STOPPED. SIGNALS DISPLAYING APPROACH ASPECT TRAINS MAY PASS AT REDUCED SPEED IN ANTICIPATION OF STOPPING AT NEXT SIGNAL OR INTERLOCKING.
FAILURE TO STOP FOR A SIGNAL WILL RESULT IN DERAILMENT, COLLISION, DISCIPLINARY ACTION OR ALL OF THE ABOVE.
M. L. Agne Division Superintendent