mvlogocolorsmall.gif (3382 bytes)

Moose Valley RR Co.

Operations Headquarters: M. Leon Agne Engine Facility, 7021 Surrey Drive, Berkeley Spgs W.Va. (304) Ro4-1424

Bulletin #19993

May 15, 1970

TO: All train crews, M of W Personnel.

ON: Road service, crews with seniority district - Mainline Subdivision.

DIVISION: Delta

SUBDIVISION: Mainline

NEW SWITCH INSTALLED AT MP 36.1, NEW SUBDIVISION ANNOUNCED.

A NEW SWITCH HAS BEEN INSTALLED TO CONNECT THE MAINLINE SUBDIVISION AT MP 36.1 WITH THE PENN CENTRAL MAINLINE AT CARLISLE VIA THE NEW MOOSE VALLEY EAST SUBDIVISION.  THIS SWITCH WILL BE KNOWN AS "NEW PROSPECT".  THE NEW PROSPECT SWITCH IS A RIGHT HAND 6 DEGREE REMOTE CONTROLLED BY THE VALLEY DISPATCHER.   ALL TRAINS ENTERING OR EXITING THE CLEARANCE POINTS WILL BE REQUIRED TO STOP AND CONTACT THE DISPATCHER FOR AUTHORIZATION TO PROCEED.  NO SIGNALING IS CURRENTLY IN PLACE, AND THE EAST SUBDIVISION IS DARK.

Updated System Map

M. L. Agne – Division Superintendent